• Latest
  • Trending
  • All
  • News
  • Economy
  • World
  • Lifestyle
Govt acquires equipment for urban areas road repairs

Govt acquires equipment for urban areas road repairs

3 years ago
China in Africa: Who is fooling who?

China in Africa: Who is fooling who?

2 years ago
Sino-Zim: Turning the ironclad pact into dollars

Sino-Zim: Turning the ironclad pact into dollars

2 years ago
If our friends in China did it…

If our friends in China did it…

2 years ago
Handbook to guide Gukurahundi Outreach

Handbook to guide Gukurahundi Outreach

2 years ago
Harare building collapses, woman dies

Harare building collapses, woman dies

2 years ago
Africa backs Zimbabwe’s Security Council bid

Africa backs Zimbabwe’s Security Council bid

2 years ago
ED says no to third term

ED says no to third term

2 years ago
Banks start changing accounts to ZiG

Banks start changing accounts to ZiG

2 years ago
SADC will prioritise food security, says Incoming Chairperson

SADC will prioritise food security, says Incoming Chairperson

2 years ago
Caps fans invade pitch, match abandoned

Caps fans invade pitch, match abandoned

2 years ago
Measures to promote use of ZiG

Measures to promote use of ZiG

2 years ago
ZiG starts circulating on April 30

ZiG starts circulating on April 30

2 years ago
  • About
  • Advertise
  • Privacy & Policy
  • Contact
Wednesday, April 22, 2026
  • Login
Zim Sentry
  • Local News
  • Africa
  • International
  • Thought Leader
  • Economy
  • Lifestyle
  • SportsTrending
No Result
View All Result
Zim Sentry
No Result
View All Result
Home Local News

Govt acquires equipment for urban areas road repairs

January 31, 2023
in Local News
0
Govt acquires equipment for urban areas road repairs
496
SHARES
1.4k
VIEWS
Share on FacebookShare on Twitter

THE Government has bought state-of-the-art equipment under the Emergency Road Rehabilitation Programme (ERRP) as it moves to repair and reconstruct roads in most residential areas in and around the city which are now in a bad state following council’s failure to rehabilitate them.

So far, the Government has rehabilitated at least 40 roads in the city and by next week, 15 other roads are set to be reconstructed.

Yesterday, Transport and Infrastructural Development Minister Felix Mhona commissioned the equipment which was bought through the CMED (Private) Limited.

They include two road reclaimers, two D8 Bulldozers, four 20 000-litre water bowsers, two 20-tonne recovery trucks, three excavators, four graders, one double drum roller, three Padfoot Rollers, three pneumatic rollers, two chip spreaders, one front end loader, four 10-tonne lorries and one tractor horse.

The equipment was commissioned along Alpes Road which CMED has since started reconstructing.

Addressing journalists, Minister Mhona said Alpes Road was one of the most topical roads that the ministry was seized with in terms of inquiries from the people about when it was going to be reconstructed.

“However, let me hasten to clarify issues here. Roads under local authorities, that is cities, fall under the purview of local authorities. And if you remember very well, we had this debate about Zinara, about the City of Harare saying this one is not getting adequate funding.

“But let me say when we talk of a listening President, we then discussed that City of Harare has failed. Why they have failed is because they have been given their allocation on a quarterly basis and this has been actually flighted by Zinara to say this is what is going to local authorities and this is what is going to rural district councils and department of roads,” he said.

He said since councils have failed, Government cannot continue watching the deterioration of the roads.

“So what it entails is that our roads are weak, even if we do pothole patching we still need to do complete reconstruction. And a good example of this is the one road that we are witnessing today (yesterday), that is Alpes. And I am happy that it will start covering Mount Pleasant, it would go to Vainona, Hatcliffe and this stretch is going to cover close to 18km,” Minister Mhona said.

On the equipment, he said, under the New Dispensation, Government changed its model on the delivery of road infrastructure, with the Department of Roads assuming a quality control function while local contractors became active players in the rehabilitation of road infrastructure in line with the empowerment drive.

He said the company has gradually, over the past two years been procuring equipment for the construction and Civil Works Unit, capacitating it to fulfil its mandate.

“It is highly commendable for a company to recapitalise to the scale we are witnessing today, given the prevailing inflationary environment. CMED is surely transforming itself into a multifaceted equipment centre with all Government equipment solutions meant to position it as a tech hub that will definitely change the fortunes of the nation.

“Most of the equipment is already on the ground. Indeed, the CMED has gone into an overdrive mode in terms of recapitalisation. A lot more is expected to be delivered in batches. The new acquisitions therefore reduce the company’s operating costs as there won’t be need to hire such equipment from other operators,” he said.

CMED has implemented a number of road projects throughout the country since the Construction and Civil Works Unit commenced operations in March 2021.

CMED managing director Engineer Davison Mhaka said Zimbabwe has an estimated road network of 84 000km, out of which 93 percent of the network was in fair or poor condition and in need of rehabilitation or periodic maintenance.

“The Zimbabwean Government has targeted to increase the number of kilometres of road network converted to meet Southern Africa Transport and Communications Commission (SATCC) standards from 5 percent to 10 percent by 2025; and to increase the number of kilometres of road network in good condition from 14 702km to 24 500km by 2025.

“In this light, CMED’s recapitalisation and capacity building thrust is well in line with the NDS 1 and the National Vision 2030. For the years, 2021 and 2022, as CMED we managed to rehabilitate a total of 41,7km of asphalt roads and 340,48km of rural roads across the country,” he said.

Some of the major urban road projects rehabilitated by CMED in the last two years are Boshoff drive in Harare; Kelvin South; Ruwa Mushanje; Paisley; Masotcha Ndlovu; Ceres; Kent; Masiyephambili in Bulawayo; Mbizo road in Kwekwe and Magamba Road in Mutare.

Mr Mhaka said going forward, CMED would venture into land development and agricultural projects that include land clearing, dams and canals construction, and all irrigation-related projects. – The Herald

Tags: Emergency Road Rehabilitation Programme (ERRP)
Share198Tweet124Share50
tendaik1

tendaik1

  • Trending
  • Comments
  • Latest
Richarlison World Cup goal voted best of the tournament

Richarlison World Cup goal voted best of the tournament

December 24, 2022
By-election victories have primed us for 2023 polls, says ZANU PF

By-election victories have primed us for 2023 polls, says ZANU PF

October 24, 2022
New pay structure for civil servants

New pay structure for civil servants

January 8, 2023
China in Africa: Who is fooling who?

China in Africa: Who is fooling who?

0
Zim/Iran seek improved economic relations

Zim/Iran seek improved economic relations

0
President Masisi to open Harare Agric show

President Masisi to open Harare Agric show

0
China in Africa: Who is fooling who?

China in Africa: Who is fooling who?

October 5, 2024
Sino-Zim: Turning the ironclad pact into dollars

Sino-Zim: Turning the ironclad pact into dollars

October 5, 2024
If our friends in China did it…

If our friends in China did it…

February 25, 2026
Zim Sentry

Copyright © 2022 ZimSentry. All Rights Reserved

Your Trusted Watchman

  • About
  • Advertise
  • Privacy & Policy
  • Contact

Follow Us

No Result
View All Result
  • Local News
  • Africa
  • International
  • Thought Leader
  • Economy
  • Lifestyle
  • Sports

Copyright © 2022 ZimSentry. All Rights Reserved

Welcome Back!

Login to your account below

Forgotten Password?

Create New Account!

Fill the forms below to register

All fields are required. Log In

Retrieve your password

Please enter your username or email address to reset your password.

Log In

You cannot copy content of this page

no_deposit_bonus