• Latest
  • Trending
  • All
  • News
  • Economy
  • World
  • Lifestyle
US$1,2 million for Luveve Road Matshobana section rehab

US$1,2 million for Luveve Road Matshobana section rehab

3 years ago
China in Africa: Who is fooling who?

China in Africa: Who is fooling who?

1 year ago
Sino-Zim: Turning the ironclad pact into dollars

Sino-Zim: Turning the ironclad pact into dollars

1 year ago
If our friends in China did it…

If our friends in China did it…

1 year ago
Handbook to guide Gukurahundi Outreach

Handbook to guide Gukurahundi Outreach

2 years ago
Harare building collapses, woman dies

Harare building collapses, woman dies

2 years ago
Africa backs Zimbabwe’s Security Council bid

Africa backs Zimbabwe’s Security Council bid

2 years ago
ED says no to third term

ED says no to third term

2 years ago
Banks start changing accounts to ZiG

Banks start changing accounts to ZiG

2 years ago
SADC will prioritise food security, says Incoming Chairperson

SADC will prioritise food security, says Incoming Chairperson

2 years ago
Caps fans invade pitch, match abandoned

Caps fans invade pitch, match abandoned

2 years ago
Measures to promote use of ZiG

Measures to promote use of ZiG

2 years ago
ZiG starts circulating on April 30

ZiG starts circulating on April 30

2 years ago
  • About
  • Advertise
  • Privacy & Policy
  • Contact
Monday, December 1, 2025
  • Login
Zim Sentry
  • Local News
  • Africa
  • International
  • Thought Leader
  • Economy
  • Lifestyle
  • SportsTrending
No Result
View All Result
Zim Sentry
No Result
View All Result
Home Local News

US$1,2 million for Luveve Road Matshobana section rehab

February 12, 2023
in Local News
0
US$1,2 million for Luveve Road Matshobana section rehab
496
SHARES
1.4k
VIEWS
Share on FacebookShare on Twitter

THE Bulawayo City Council (BCC) has made significant strides in rehabilitating a section of Luveve Road that had become impassable due to potholes.

So bad was the section of the road that motorists had abandoned it for pathways and roads that pass through residential areas which was risky for Matshobana suburb residents as children normally play on the streets. Luveve Road is one of the busiest roads in the city as it links most western areas to the city centre.

BCC public relations officer Miss Bongiwe Ngwenya told Sunday News that works were being conducted on the section of Luveve Road where the local authority was expecting to spend at least US$1,2 million on the project.

“The City of Bulawayo continues to carry out the rehabilitation works on Luveve Road — Matshobana section. To date the reconstruction works have involved base preparation and final compaction of bases completing the earthworks. Currently ongoing is the priming of the road before surfacing with bituminous material. The primer is meant to prevent the ingress of water into the gravel sub-bases and creates a bond between the sub-bases and the asphalt concrete/tar. To date we have reconstructed, compacted and primed the bases, which is where all the strength of a good road is determined. We are allowing the prime to dry, and thereafter we will commence surfacing the base. The rehabilitation works are funded by council,” said Miss Ngwenya.

A visit by Sunday News yesterday to the section of the road in Matshobana suburb revealed that work was indeed in progress, much to the delight of motorists who are temporarily using the one-way lane as part of the road has been barricaded to allow for completion of works. The road is one of the five roads identified by council for emergency rehabilitation, with others being Matopos, Wellington,Khami Road and Steelworks. Council also intends to do overlays along Khami Road from the flyover to Mpopoma Avenue as well as Matopos Road from 23rd Avenue to Leander Road.

The roadworks, which started last month are expected to be completed within three months and are in line with calls for the rehabilitation of roads by the Minister of Transport and Infrastructural Development, Cde Felix Mhona. At the end of last year, Minister Mhonatoured the section of the Luveve Road that is now being rehabilitated and directed the Zimbabwe National Roads Administration (Zinara) to release funds to the local authorities in the country to attend to the roads. BCC submitted a $3 billion quotation to the Government after it pledged to release funds to rehabilitate some of the city’s unnavigable roads. – Sunday News

Tags: BULAWAYO City Council (BCC)
Share198Tweet124Share50
tendaik1

tendaik1

  • Trending
  • Comments
  • Latest
Richarlison World Cup goal voted best of the tournament

Richarlison World Cup goal voted best of the tournament

December 24, 2022
By-election victories have primed us for 2023 polls, says ZANU PF

By-election victories have primed us for 2023 polls, says ZANU PF

October 24, 2022
A new ocean is being formed in Africa

A new ocean is being formed in Africa

February 11, 2023
China in Africa: Who is fooling who?

China in Africa: Who is fooling who?

0
Zim/Iran seek improved economic relations

Zim/Iran seek improved economic relations

0
President Masisi to open Harare Agric show

President Masisi to open Harare Agric show

0
China in Africa: Who is fooling who?

China in Africa: Who is fooling who?

October 5, 2024
Sino-Zim: Turning the ironclad pact into dollars

Sino-Zim: Turning the ironclad pact into dollars

October 5, 2024
If our friends in China did it…

If our friends in China did it…

October 5, 2024
Zim Sentry

Copyright © 2022 ZimSentry. All Rights Reserved

Your Trusted Watchman

  • About
  • Advertise
  • Privacy & Policy
  • Contact

Follow Us

No Result
View All Result
  • Local News
  • Africa
  • International
  • Thought Leader
  • Economy
  • Lifestyle
  • Sports

Copyright © 2022 ZimSentry. All Rights Reserved

Welcome Back!

Login to your account below

Forgotten Password?

Create New Account!

Fill the forms below to register

All fields are required. Log In

Retrieve your password

Please enter your username or email address to reset your password.

Log In

You cannot copy content of this page